Description
REORDER FOR MATERIAL REQUIRED TO SWITCH TO FLOOR MOUNT. PER DRAWINGS PDF ATTACHED UNDER SUB TAB. HARDWARE TO BE REUSED FOR ALL MATERIAL EXCEPT FOR THE NEW STILE AND PANEL REQUIRED.
SHIPPING TO 33146. 2 WEEK LEAD TIME.
COMPLETION OF CHECKOUT IS CONSIDERED TO BE APPROVAL WITH NO CHANGES REQUIRED.
